Assumptions for Specific Project in Preparation of Cost Plan - Quantity Surveying Practices

Friday, September 16, 2011

Assumptions for Specific Project in Preparation of Cost Plan


Coursework scenario clearly mentioned that this cost plan to be prepared at the very early stage of the project. There is only little information available such as Location, Shape, Size and Height of the project. Therefore estimator has to come up with some assumptions for the purpose of building up a cost plan at the very early stage of the project.

· Maximum time period for project

· Required services (hot water, security system etc)

· Construction methods

· Quality requirement

· Manage space into partitions (rooms, lobby, bathrooms)

· Suitable materials for project (tile or asbestos roof etc.)

· Construction schedules